To find out about the nearest WAMGROUP Subsidiary explore Global Network
  • Discover WAMGROUP
  • Global Network
  • News & Events
  • Careers Worldwide
  • Suppliers
Contact us
WAM Engineering

WAMGROUP Equipment in Biomass Plants

11/12/2018  | 
Case history
The Perkins Bio Fuel Chicken Manure Biomass Plant,in Hereford, was set up in June 2015.
 
The biomass burner started production in February 2018.The Farm houses 750,000 chickens on a 38-day turnaround from hatch to poultry.
 
Energy Innovations installed a biomass plant to burn the litter produced by the chickens. Two 8.5 m-long SSC Shaftless Screw Conveyors are flood-fed by a drag arm and feed in their turn a 10.6 m long SSC Shaftless Screw, which conveys the manure toward the burner.
 
The equipment layout had to be designed around 2 separate loading bays, which are divided by a thick wall. To adhere to this, WAM Engineering fitted one SSC Shaftless Screw Conveyor each per loading bay, individually fed by a drag arm.
 
GDPR On May 25, 2018, the new General Data Protection Regulation (GDPR) enters into effect in all EU member states. Please check how we have adjusted our privacy policy in accordance with the European legislation.

This site uses cookies, including third parties, in order to improve your experience and to provide services in line with your preferences. By closing this banner, scrolling this page or by clicking any of its elements consent to the use of cookies. If you want to learn more or opt out of all or some cookies go to the section:
Privacy Policy and Cookies